Corridor Guide · Thane

Teen Hath Naka: where Thane begins, and what actually holds up

One premium project we have reviewed, a junction where the Eastern Express Highway, LBS Marg and the Central Line already meet, and a metro line and a tunnel still being built. This page replaces a brochure with what we could verify: what is here, what is coming, and who this address suits. Updated November 2026.

5 acres
Two towers, G+50, per the brochure
Line 4
Station list includes Teen Haath Naka
₹3.90 Cr+
3 BHK starting from, 3 Nov 2026
₹0
Brokerage to the Buyer
On the Ground

What Is Being Built at Teen Hath Naka

Aurel by Adani is the project we have reviewed end to end, including the developer's brochure, the floor plans and the MahaRERA number they print. Other projects exist around the junction; we list only what we have reviewed, and where we have not seen a document, we say so.

ProjectDeveloperConfigurationPriceMahaRERA No.Our status
Aurel by AdaniAdani Realty3, 4 BHK3 BHK from ₹3.90 Cr plus taxes (3 Nov 2026)PR1330002602405, as printed by the developer. Tower E.Reviewed

Prices are starting figures and move with floor, tower and offer. Maintenance, taxes and other charges are extra. Confirm every MahaRERA number on maharera.maharashtra.gov.in before you book.

What Is Here, What Is Coming

Connectivity, Stated Plainly

The first four rows are what the developer's brochure lists as already in place. The rest are works still under way. The brochure gives no distances or opening dates, and neither do we.

ConnectionStatusSource
Eastern Express HighwayIn placeDeveloper's brochure
LBS MargIn placeDeveloper's brochure
Thane railway station and the Central LineIn placeDeveloper's brochure
Ghodbunder RoadIn placeDeveloper's brochure
Metro Line 4, Wadala to KasarvadavaliUnder constructionStation list on Wikipedia, brochure
Kopri Bridge widening, 4 to 8 lanesDescribed as comingDeveloper's brochure
Thane–Borivali twin tube tunnelUnder construction, 13.73% physical progress till August 2026MMRDA

Coming, Not Yet Running

Metro Line 4 runs Wadala to Kasarvadavali, and its station list includes Teen Haath Naka. It has been reported with a first-section target of December 2026 (Kasarvadavali to Cadbury Junction) and the Wadala end in November 2027. We have not seen an official MMRDA opening date, so we do not quote one to a buyer.

MMRDA's page for the Thane–Borivali twin tube tunnel gives 11.84 km including the connector, a cost of ₹18,838 crore, a 60-month completion period and 13.73% physical progress till August 2026, with tunnelling in progress from the Thane side. That is years of work still to go.

The brochure also describes a Kopri Bridge widening from 4 to 8 lanes and Metro Lines 4A and 5. These depend on the authorities, and the developer does not guarantee their timing.

The Mumbai Side of Thane, At a Premium

Teen Hath Naka suits a buyer for whom the Mumbai side of Thane matters: the Eastern Express Highway, the Central Line and a short road to Mulund and beyond. Aurel is a G+50 tower launch, and a 3 BHK starts from ₹3.90 crore plus taxes, so this is the premium end of what we cover.

A junction this well connected is also a busy one, so visit at peak hour before you decide. If your first test is price, read Kalher. If you want a quieter pocket for a large brief, look at Pokhran Road. If you are weighing it against the closer micro-markets, read Majiwada-Balkum as well.

Considering Teen Hath Naka?

A founding partner reads every enquiry. We confirm which homes are open, the all-in price for your floor, the possession date and the MahaRERA number that covers your tower, before you pay a token.

See Aurel by Adani WhatsApp Us
Before You Ask

Teen Hath Naka, Answered Plainly

Teen Hath Naka is the junction on LBS Marg where the Eastern Express Highway meets Thane, at the start of the city on the road in from Mumbai. The developer's brochure lists the Eastern Express Highway, LBS Marg, Thane railway station, Ghodbunder Road and the Central Line as already in place. It gives no distances, so we quote none; drive it once at your own commute time.

Metro Line 4 (Wadala to Kasarvadavali) is under construction, and its station list includes Teen Haath Naka. Line 4 has been reported with a first-section target of December 2026 and a Wadala end in 2027, but we have not seen an official MMRDA opening date, so treat the metro as upcoming and check the current status before you rely on it.

Aurel by Adani showed a 3 BHK starting from ₹3.90 crore plus taxes as on 3 November 2026, subject to floor, tower and offer, with maintenance and other charges extra. Ask us for the all-in price for your floor before you compare.

RERA carpet is what the law counts. Total area adds balconies and utility. For Tower E the developer's floor plans give RERA carpet of 1,513, 1,647 and 1,997 sq ft for the 3 BHK, 4 BHK Classic and 4 BHK Luxe, and total areas of 1,602, 1,741 and 2,281 sq ft. Always ask which of the two a quote uses.

Nothing. So'Niche is a channel partner and the developer pays us, so the advisory is free to the buyer. No brokerage, no consultation fee.